From one bunker to a planetary network. 从一个地下堡垒到全球网络。
Svalbard is the smallest credible unit. Once the 200-person pilot is proven, the same standard is replicated across Sub-DAOs on four continents. Every milestone below is gated by what the previous phase actually demonstrated. 斯瓦尔巴是"最小可信单元"。200 人首站验证通过后,同一标准将复制到四大洲的 Sub-DAO。每个里程碑都以上一阶段实际验证为前置条件。
Single-site validation · Svalbard pilot 单点验证 · 斯瓦尔巴首站
Preparation · months 1-18 筹备期 · 第 1-18 个月
18 months- 02 Commission Norwegian Geological Survey (NGU) detailed geological survey and radon measurement at target site 委托诺尼地质调查局(NGU)开展斯瓦尔巴目标场地地质详勘与氡气测量
- 03 Pre-engagement with Norwegian Environment Agency on EIA approval pathway 启动诺尼环境局环评预沟通,明确许可路径
- 04 Register Marshall Islands DAO LLC and Swiss Association 在马绍尔群岛注册 DAO LLC,在瑞士注册协会
- 05 Recruit first 50 founding members (scientists, polar explorers, blockchain engineers, sustainable agriculture practitioners) 招募首批 50 名创始会员(科研工作者、极地探险家、区块链工程师、可持续农业从业者)
- 06 Sign technical cooperation MoU with Broad Group on B-CORE underground adaptation 与远大集团签署 B-CORE 模块地下适配技术合作备忘录
- 06 Build and run a 1:1 ground prototype of the 10-layer aeroponic cube: 5 to 20 micron mist loop, root desiccation redundancy test, three tier crop recipes, 240 m² target yield validation 建造并运行 10 层气雾立方舱 1:1 地面原型:5 至 20 微米雾化回路、根系失水冗余测试、三层作物配方、240 ㎡ 目标产量验证
Construction · months 19-42 建设期 · 第 19-42 个月
24 months · two construction seasons- 07 Complete EIA approval + building permit 完成环评审批与建筑许可
- 08 Lock TBM supplier (CREC or Herrenknecht), sign purchase contract 确定盾构机供应商(中铁装备或海瑞克),签署采购合同
- 09 Develop + audit DAO governance smart contracts (Compound/Aave battle-tested pattern) 开发与审计 DAO 治理智能合约(沿用 Compound/Aave 经过实战检验的模式)
- 10 Build entry shaft + temporary facilities (first construction season) 建设入口竖井和临时设施(首个施工季)
- 11 Freeze cube module design + serial build of 2 flight modules (N+1) + nutrient loop factory acceptance test 立方舱设计冻结 + 2 套正样舱(N+1)投产 + 营养液回路出厂验收
- 12 Tunnel boring across 3,500m (second construction season, November-April cold window) 跨 3,500 米盾构掘进(第二个施工季,11 月至次年 4 月低温窗口)
- 13 Install 80 B-CORE modules + 2 aeroponic cube modules (N+1) + ecosystem systems integration + commissioning 80 套 B-CORE 模块安装 + 2 套气雾立方舱(N+1)+ 生态系统集成 + 联调
Trial operations · months 43-48 试运营 · 第 43-48 个月
6 months · pioneer cohort- 14 50-person pioneer cohort moves in · system pressure test 50 人先锋队入驻 · 系统压力测试
- 15 DAO governance trial run with real proposals + emergency mode drill DAO 治理试运行 · 真实提案 + 紧急模式演练
- 16 Polar night 90-day off-grid endurance test, aeroponic output held at 108 kg/d 极夜 90 天离网耐力测试,气雾产出维持 108 kg/天
Full operations · month 49+ 全面运营 · 第 49 个月起
ongoing- 17 200-person full capacity · research collaboration launches 200 人满负荷运营 · 科研合作启动
- 18 80%+ occupancy sustained · $200k/year research revenue · DAO self-governance 80%+ 入住率维持 · 科研收入 $20 万/年 · DAO 自治运行
Regional expansion · 3-site triangle 区域扩展 · 三站点三角网络
Nordic second site. Validates replication under different permafrost / bedrock conditions. Lower polar night intensity than Svalbard.
北欧第二站点。在不同永冻土/基岩条件下验证复制可行性。极夜强度低于斯瓦尔巴。
Adapt the Vivos xPoint 575-bunker shell. 150 people. DAO governance retrofit test. US logistics network.
改造 Vivos xPoint 575 个掩体现成设施。150 人。DAO 治理改造验证。美国物流网络。
Cross-site mutual aid: supply chain redundancy, personnel rotation, knowledge sharing. First real test of Sub-DAO architecture.
跨站点互助:补给链冗余、人员轮换、知识共享。Sub-DAO 架构首次实测。
Global network · 6-8 sites on 4 continents 全球网络 · 6-8 站点 · 4 大洲
EU hub · 100 ppl · legal compliance + financial services infrastructure
欧洲枢纽 · 100 人 · 高端法律合规 + 金融服务基础设施
Asia-Pacific · 150 ppl · optimal climate + southern hemisphere backup
亚太 · 150 人 · 最优气候 + 南半球备份
Under evaluation · 4th network node candidate
评估中 · 全球网络第四节点候选
Civilization survival probability uplift vs single-site
相比单站点,文明存续概率跃升
Annual Global DAO Assembly 全球 DAO 代表大会(年度)
All Sub-DAO representatives gather once per year. Major cross-network decisions ratified by full token-holder vote. Best practices cross-pollinate. Annual whitepaper released to the public under CC BY-SA 4.0.
所有 Sub-DAO 代表每年聚集一次。重大跨网络决策由全网代币持有者投票批准。最佳实践互通。每年以 CC BY-SA 4.0 公开发布白皮书。
Back phase 1, fund the network. 资助阶段 1,孵化整个网络。
Founding-member commitments close when the first 100 seats are filled. 首批 100 个创始会员席位签满即截止。